39 · Streams & Creek Construction
A stream is a long, narrow pond with attitude. It moves water, oxygenates it, and adds the sound of a brook to the garden.
Design
Plan a meandering path wider than you think, with at least one or two drops for sound and aeration. A gentle overall fall (say 2–5%) keeps flow lively without a huge pump.
Liner, folds & rockwork
- Line the whole run in one piece where possible; overlap seams uphill.
- Create gentle folds under the liner so it hugs the channel, not bridges it.
- Set rocks so they direct flow and hide the liner; let bio-film grow for a natural look.
Pump sizing for long runs
Long streams lose head to friction. Size the pump for the desired flow at the total dynamic head (vertical lift + run length + bends). Undersized streams look like a trickle; oversized ones erode the bed.
Leak points
Most stream leaks are at the start (pump vault), at drops (splash-over), or where the liner crests a fold. Keep lips slightly raised and backfill behind them.
Stream construction steps
- Plan the route: gentle curves look natural; avoid straight lines.
- Dig a shallow channel: 150–300 mm deep, 300–600 mm wide.
- Create pools every 2–3 metres for visual interest and oxygenation.
- Lay underlay and liner along the entire route.
- Cover with stone: place large flat stones first, then fill gaps with smaller pebbles.
- Plant the margins with moisture-loving plants.
Gradient guide
A 1:30 gradient (1 cm drop per 30 cm run) creates a steady, gentle flow. Steeper than 1:10 and the water moves too fast for plants. Shallower than 1:50 and water stagnates.